2012 0124 LAM questions on Phase I redraft
2012 0125 Phase I draft to PolyMet cover email
2012 0126 followup to ERM after LAM question
2012 0130 Barr response to Phase I draft
Additional Software SQA_061213
Approach for addressing 040513 comments
Approach for addressing comments_040913_ERM_pjh
Approach for addressing comments
Calibration Summary Review_072012
Cap and Scaling Factors_112912
Co-lead_EPA_041613 Meeting_Draft Outcomes
Colead Agency GoldSim QAQC DRAFT work plan_012512
Control volumes – marinelli – 2012-08-06 (3)
Control volumes – marinelli – 2012-08-06
Copy of NorthMet GoldSim QAQC Tracking 16Aug2012
DNR Comments on 122311 Redraft of QAQC Work Plan_010512
DNR Comments on 122311 Redraft of QAQC Work Plan_010612
EPA Questions on GoldSim Model Review (2)
EPA Requested Modeling Information_090811
EPA Review of GoldSim 4-5-2013 (received separately 9-30-13)
EPA Review of GoldSim 4-6-2013 (2)
ERM Model Evaluation Plan for GoldSim based modeling_120211
ERM Phase II QAQC document for review_041712
Flow Concentration Chem Flux Cat 1 Stockpile_072112
Follow-up on NMET GoldSim QAQC_022713
FTB Cell 2W fine sulfate release 2012-08-31
FTB Groundwater Modeling_081512
FTB_Infiltration_Timeseries_PlantSite_North Beach
GoldSim AWMP Assumptions_071812
GoldSim Evaluation Work Plan w Water Modeling Review Diagram_050212
GoldSim Groundwater Modeling_081512
GoldSim Input Plant Model_100912a
GoldSim Input Plant Model_100912b
GoldSim Input Plant Model_101612
GoldSim Inputs Plant Model_100912
GoldSim Inputs Plant Model_100912a
GoldSim Inputs Plant Model_101512
GoldSim Inputs Plant Model_101712
GoldSim Mine Site Model_093012
GoldSim Model Evaluation 041513
GoldSim Model Evaluation_020212
GoldSim Model Evaluation_022513
GoldSim Model Evaluation_022513a
GoldSim Model Evaluation_031113
GoldSim Model Evaluation_032613
GoldSim Model Evaluation_040513 (2)
GoldSim Model Evaluation_040513
GoldSim Model Evaluation_040513a
GoldSim Model Evaluation_040913
GoldSim Model Evaluation_041213
GoldSim Model Evaluation_041413
GoldSim Model Evaluation_041513a
GoldSim Model Evaluation_041513b
GoldSim Model Evaluation_041613
GoldSim Model Evaluation_041613a
GoldSim Model Evaluation_041713
GoldSim Model Evaluation_042313
GoldSim Model Evaluation_041713
GoldSim Model Plant Site_100112
GoldSim Model QAQC Tasks 1 2_070612
GoldSim Model_Eval_Plans_Rev_23Dec2011 (2)
GoldSim Model_Eval_Plans_Rev_23Dec2011_MO JF ZW SA ML comments_v2 (2)
GoldSim Model_Eval_Plans_Rev_23Dec2011_MO JF ZW SA ML comments_v2
GoldSim Model_Eval_Plans_Rev_23Dec2011_MO JF ZW SA ML comments
GoldSim Model_Eval_Plans_Rev_23Dec2011
GoldSim Phase II Work Plan_032312
GoldSim Plant Site Inputs_101512
GoldSim QAQC Communication_072612
GoldSim QAQC Info Request_042512
GoldSim QAQC Info Request_042612
GoldSim QAQC Work Plan_042412a
GoldSim QAQC_Phase I Inputs_Marinelli_050313
GoldSim Required Model Updates_121012
GoldSim Task 1 QA Plant Site_061112
GoldSim Task 1 QA Plant Site_062612
GoldSim Water Modeling Flowchart_012412
GoldSim_Mine Site Model Comment Form (2)
GoldSim_Mine Site Model Spreadsheet Comment Form (2)
Initital mine site CVs to Peter Hink
Mathcad – Mine Site – Cat 1 sulfate mass flux
Memo -Task 1 QA review of Plant Site Model Base v01 May 2012 (2012 05 08)
Memo -Task 1 QA review of Plant Site Model Base v01, May 2012 (2012.05.08)
Mine Site Flow Concentrations_072112
Mine Site Model Uploaded_013113
Mine Site Phase 1 Summary_020112
Mine site QA – task 1 – ERM Overview 020212
Mine site QA – task 1 – summary table 2012-02-02
Mine site QA – task 1 – summary table 020212
Mine site QA – task 1 – to Dave Blaha 2012-02-02
Mine Site Stockpile PH_071812a
MineSite_Outputs_forEPAcomment6
myers Northmet data needs memo 062112
NMet EIS – ERM QA memo on water model 10-30-12
NMet GoldSim QA Memo Phase 3 2013-02-25
NMet QA Memo Mine Site_01-17-13
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase I and II_ERM Draft 040912_clean
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase I and II_ERM Draft 040912_MO comments
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase I Only_Revised ERM Draft 012012 (3)
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase I Only_Revised ERM Draft 012012
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase I Only_Revised ERM Draft 012412
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase I Only_Revised ERM Draft 012412_Track Changes
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase II Only_Revised ERM Draft 030612 js Barr
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase II Only_Revised ERM Draft 030612 js
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase II Only_Revised ERM Draft 030612 LAM
NorthMet EIS_GoldSim Model Evaluation Work Plan_Phase II Only_Revised ERM Draft 030612
NorthMet GoldSim Model QAQC_080212
NorthMet GoldSim models updated (Ver. AWMP 2.3)_081712
NorthMet GoldSim QAQC Tracking 2Aug2012 (2)
NorthMet GoldSim QAQC Tracking 2Aug2012 (3)
NorthMet GoldSim QAQC Tracking 2Aug2012 (4)
NorthMet GoldSim QAQC Tracking 2Aug2012 (5)
NorthMet GoldSim QAQC Tracking 2Aug2012
NorthMet GoldSim QAQC Tracking 02Oct2012 – CDA_Pint 101712
NorthMet GoldSim QAQC Tracking 02Oct2012
NorthMet GoldSim QAQC Tracking 10Aug2012
NorthMet GoldSim QAQC Tracking 16Aug2012 (2)
NorthMet GoldSim QAQC Tracking 16Aug2012 (3)
NorthMet GoldSim QAQC Tracking 16Aug2012
NorthMet GoldSim QAQC Tracking_080212
Northmet Mine Site Water Quality Model Flowchart ALL – CONTROL VOLUMES
NorthMet Model Version 3_100112
NorthMet Required Model Updates
Phase I Evaluation – Mine Site GoldSim Model_020112
Plant site – ftb – seepage at north toe
Plant Site – North PRB – sulfate
Plant Site Control Volumes – 072612
Plant Site Control Volumes 3 and 4
Plant Site Control Volumes for Task 2 QAQC
Plant Site Functions and Notes spreadsheet_071912
Plant Site Model Inputs_042412
Plant Site Model Submittal_020513
Plant Site Note Pane Documentation (2)
Plant Site Note Pane Documentation_071912
Plant Site Phase I Evaluation_020212
Plant Site QA – North PRB check_072712
Plant site QA – task 1 – memo 2012-05-08
Plant site QA – task 1 – memo 050812
PlantSite_CV_4 seepage sulfate conc 2012-08-31
PolyMet Plant Site QAPP Comments 051112 barr dnr
PolyMet Plant Site QAPP Comments 051112
PolyMet Plant Site QAPP Comments
QA Memo for Water Model Review_103012
QA Memo for Water Model_103012
R-NorthMet GoldSim Mine Site Model1
R-NorthMet GoldSim Plant Site Model2
Redraft of QAQC Work Plan_010612
Response_Summary of Calibrations and Plant Site Corroboration Comments ver1 071712
Review of GoldSim Inputs_012512
Sulfate release rate for flotation tailings_100512
Sulfate release rate for flotation tailings_100712
Summary of Calibration and Corroboration Memo (shaded) JUL2012
Summary of Calibration and Corroboration Memo v2 JUL2012
Table Summary of Task 1 QA review of Plant Site Model Base v01 May 2012 – Barr Response (2)
Table Summary of Task 1 QA review of Plant Site Model Base v01 May 2012 – Barr Response
Table Summary of Task 1 QA review of Plant Site Model Base v01 May 2012 – Follow-up by Interralogic
Table Summary Task 1 QA review Plant Site Model Base v1 May 2012 Follow-up Interralogic
Tetra Tech Review of NorthMet GoldSim Models 082912
Water Model and Project Development Tracking – 4-18-12 xls
Water Model Development_042212
Water Modeling Review Diagram of Information Flow 050912
Water Modeling Workplan – Plant Site v6 JUL2012
Water Modeling Workplan – Plant Site v7 OCT2012
Water Quality Model – Plant Site QAPP v1 APR2012